| Overview | |
|
One Owner Since New Collins Proline 21 Avionics BLR Winglets Raisbeck Ram Air Recovery System 4 Blade Hartzell Composite Propellers Dual Aft Folding Seats TCAS 7.1 ADS-B Out XM Weather |
|
| Price: |
$3,799,000 USD
|
| Offered By: | Guardian Jet LLC |
| Registration: | ZS-TEG |
| S/N: | BY-126 |
| Location: |
Guilford, Connecticut United States
|
| Days Active: | Today |
| Airframe | |
| Total Time: | 2,579.7 Hours |
| Landing Cycles: | 2,495 |
| Avionics | |
|
Collins Proline 21 ADF: Collins NAV-4000 AHARS: Dual Collins AHC-3000 Autopilot: Collins FGC-3000 IFCS Comm Radios: Dual Collins VHF-4000 w/8.33 spacing Compass: Magnetic EFIS: AFD-3700 #-tube 12.1 Inch Flight Director: FCG-3000 IFCS FMS: Collins FMS 3000 (WAAS/LPV) GPS: Collins GPS-4000S MFD: Collins MDC-3110 NAV Radios: Collins NAV-4000 w FM Immunity Radio Altimeter: Collins ALT-4000 TAWS: Yes TCAS: L3 Skywatch HP TCAS-1 Transponder: Dual Collins TDR-94D with enhanced surveillance &Flight ID Weather Radar: TWR-850 (Colour) CVR: L3 FA2100 (120 minute) Dual Collins ADC-3000 ESIS L3 GH-3100 XM Satellite Weather Artex 406 MHz ELT |
|
| Additional Equipment | |
|
Maintenance Programs Maintenance tracking Traxxall Avionics enrolled on Collins CASP |
|
| Engines | |
|
Engines: P&WC PT6A-52 (3,600 TBO) Eng No. 1 (s/n PCE-RX0357) Eng No. 2 (s/n PCE-RX0358) Propellers: Hartzell HC-E4N-3A (4 Blade, Composite) Prop No. 1 Time Since New (s/n NR10): 2,579.7hrs. Time Since Overhaul: 426.2 hrs. Prop No. 2 Time Since New (s/n NR734): 2,579.7 hrs. Time Since Overhaul: 426.2 hrs. |
|
| Engine 1 Hours: | 2,579.7 SNEW |
| Engine 2 Hours: | 2,579.7 SNEW |
| Interior & Exterior | |
|
(Original) The King Air 250 offers a spacious cabin configured for nine (9) passenger. The interior features a 2 aft facing seat, a four-place club arrangement, followed by a belted, side-facing lavatory and finally, removable dual aft folding seats in the baggage area. |
|
|
(Original) Overall Matterhorn White with Metallic Black and Gold Accent Striping |
|
| Other Info | |
|
Inspection Status: Items Complied with Next Due Phase 1 & 2 Jun-24 Jun-26 Phase 3 & 4 Jul-25 Jun-27 |
|
| Brochure: | View Brochure |