2009 Learjet 45XR

Overview
MLG Overhaul Complete and Mx Cleared Through EOY 2025
Avance L5
2024 Paint and Interior
Engines Enrolled on MSP
APU Enrolled on MSP
Airframe Enrolled on Smart Services
Price: Contact Seller
Offered By: Guardian Jet LLC
Registration: N32AA
S/N: 45-399
Location: Guilford, Connecticut
United States
Days Active: 33 days ago
Airframe
Total Time: 5,045 Hours
Landing Cycles: 3,980
Avionics
AIR DATA COMPUTERS: Dual Honeywell AZ-950
ATTITUDE HEADING SYSTEM: Dual Honeywell LCR-100
COMMUNICATIONS: Dual Honeywell RCZ-833K (Integrated)
COCKPIT VOICE RECORDER: Honeywell Solid State CVR
DATA ACQUISITION UNITS: Dual DA-800 Data Acquisition Unit
EFIS: Four Honeywell DU-870 Display Units
EMERGENCY LOCATOR TRANSMITTER: Artex C-406-2 ELT
EGPWS: Honeywell Mark V EGPWS Computer
FLIGHT GUIDANCE CONTROLLER: Honeywell GC-550 FGC
FLIGHT MANAGEMENT SYSTEM: Dual Universal UNS-1Ew FMS
NAVIGATION: Dual Honeywell RNZ-850 Nav Units
RADIO ALTIMETER: Honeywell RT-300 Transceiver
TCAS: ACSS RT-951 TCAS 2000 Computer
WEATHER RADAR: Honeywell WU-660 Radar Transceiver
Additional Equipment
RVSM
WAAS / LPV
VNAV
TCAS 7.1
TAWS
Lightning Detection
XM Weather
Dual FMS
LED Wing and Tail Position Lights
Flight Data Recorder
Rosen Sunvisor
Engines
TFE731-20BR-1B Engine No. - 1 Engine No. 2
Cycles: 3,880 Cycles - 3,980 Cycles
Next CZI: 6,000 Hours - 6,000 Hours
Serial Number: P-116474C - P-132154C
Engines enrolledon MSP
Engine 1 Hours: 4,866 SNEW
Engine 2 Hours: 5,045 SNEW
Interior & Exterior
(Refurbished by Elliott Aviation – Moline, IL)
This nine (9) passengerfloor plan features two (2)distinct cabin areas with an forward refreshment center and aft lavatory. Forward Refreshment: Includes storage and a coffee maker. ForwardCabin: Four (4) single seats with two (2) console tables. AftCabin: Four (4) single seats with two (2) console tables. Aft Lavatory: Aft vacuum toiletswith a belted seat rated for takeoff and landing.
Year Interior: 2024
Painted by Elliott Aviation – Moline, IL
Overall MatterhornWhitewith Striping
Year Painted: 2024
Other Info
Inspection Status:
Items Complied with NextDue
Phase A Dec. 2024 (In Work)
Phase B Dec. 2024 Dec. 2026
Phase C Feb. 2022 Feb. 2026
Phase D June 2022 June 2030
4,800 Checks Feb 2022 9,366 AFTT
MLG Overhaul N/A (In Work)
Brochure: View Brochure
Seller Website